An employee walking along a thermal pipe at the Kamojang geothermal
power plant near Garut, West Java, on March 18. State utility provider
 Perusahaan Listrik Negara is targeting an additional 135 megawatts of
electricity from three new geothermal plants. (Reuters Photo/Beawiharta)
 

"Update on Current Events" – Jul 23, 2011 (Kryon channelled by Lee Carroll) - (Subjects: God, Gaia, Shift of Human Consciousness, 2012, Benevolent Design, Financial Institutes (Recession, System to Change ...), Water Cycle (Heat up, Mini Ice Ace, Oceans, Fish, Earthquakes ..), Nuclear Power Revealed, Geothermal Power, Hydro Power, Drinking Water from Seawater, No need for Oil as Much, Middle East in Peace, Persia/Iran Uprising, Muhammad, Israel, DNA, Two Dictators to fall soon, Africa, China, (Old) Souls, Species to go, Whales to Humans, Global Unity,.. etc.)
"A Summary" – Apr 2, 2011 (Kryon channeled by Lee Carroll) (Subjects: Religion, Shift of Human Consciousness, 2012, Intelligent/Benevolent Design, EU, South America, 5 Currencies, Water Cycle (Heat up, Mini Ice Ace, Oceans, Fish, Earthquakes ..), Middle East, Internet, Israel, Dictators, Palestine, US, Japan (Quake/Tsunami Disasters , People, Society ...), Nuclear Power Revealed, Hydro Power, Geothermal Power, Moon, Financial Institutes (Recession, Realign integrity values ..) , China, North Korea, Global Unity,..... etc.) - (Text version)

“.. Nuclear Power Revealed

So let me tell you what else they did. They just showed you what's wrong with nuclear power. "Safe to the maximum," they said. "Our devices are strong and cannot fail." But they did. They are no match for Gaia.

It seems that for more than 20 years, every single time we sit in the chair and speak of electric power, we tell you that hundreds of thousands of tons of push/pull energy on a regular schedule is available to you. It is moon-driven, forever. It can make all of the electricity for all of the cities on your planet, no matter how much you use. There's no environmental impact at all. Use the power of the tides, the oceans, the waves in clever ways. Use them in a bigger way than any designer has ever put together yet, to power your cities. The largest cities on your planet are on the coasts, and that's where the power source is. Hydro is the answer. It's not dangerous. You've ignored it because it seems harder to engineer and it's not in a controlled environment. Yet, you've chosen to build one of the most complex and dangerous steam engines on Earth - nuclear power.

We also have indicated that all you have to do is dig down deep enough and the planet will give you heat. It's right below the surface, not too far away all the time. You'll have a Gaia steam engine that way, too. There's no danger at all and you don't have to dig that far. All you have to do is heat fluid, and there are some fluids that boil far faster than water. So we say it again and again. Maybe this will show you what's wrong with what you've been doing, and this will turn the attitudes of your science to create something so beautiful and so powerful for your grandchildren. Why do you think you were given the moon? Now you know.

This benevolent Universe gave you an astral body that allows the waters in your ocean to push and pull and push on the most regular schedule of anything you know of. Yet there you sit enjoying just looking at it instead of using it. It could be enormous, free energy forever, ready to be converted when you design the methods of capturing it. It's time. …”
Showing posts with label ADB. Show all posts
Showing posts with label ADB. Show all posts

Monday, August 10, 2015

Legal Protocols, Lack of Funding Stall Geothermal Development in Indonesia

Jakarta Globe, Nayantara Bhat, Aug 09, 2015

Indonesia holds 40 percent of the world's geothermal potential at sites such
as the Patuha Geothermal plant in Bandung. (JG Photo/Rezza Estily)

Jakarta. Despite Indonesia already having several plants and government plans to develop the geothermal industry, progress has been stalled by legal protocols and a lack of funding, the World Bank says.

Indonesia’s position on the Pacific Ring of Fire – the intersection of three tectonic plates – means that the country is a hotbed of seismic activity. The Indonesian Energy and Mineral Resources Ministry estimates that the country might have the potential to generate almost 28 gigawatts of energy this way – 40 percent of the world’s geothermal energy resources.

The recent Indonesian Economic Quarterly published by the World Bank in July highlighted geothermal energy production as an area of great potential. Despite a 2012 Finance Ministry fund to develop the geothermal energy sector and capital seeding of more than $200 million, the sector has not expanded as expected.

Plans to build 44 new plants and triple production capacity to 4000 MW were included in the National Energy Policy last year. However, only 175 megawatts were added between 2010 and 2014. The World Bank attributes this to several factors, including a hesitancy to invest, and a feed-in tariff that has discouraged the market.

Additionally, the country’s legal framework protecting forest areas from mining activities was only amended to allow geothermal mining in August 2014, toward the end of then-president Susilo Bambang Yudhoyono’s term.

The feed-in tariff, a subsidy scheme between geothermal energy suppliers and government-run electricity monopoly PLN, failed to be implemented as sellers and buyers were not able to agree on a fixed price.

The high level of upfront investment required for geothermal projects also means that pricing needs to be able to cover the costs. The government-regulated returns made by PLN, said the World Bank, were too low to cover the risks of geothermal development.

Aside from PLN, other major finance institutions such as the Asian Development Bank and the World Bank’s International Finance Corporation are often reluctant to fund geothermal projects from the get-go, preferring to invest once the project has been proven to have at least 50 percent of its potential.

The World Bank has recommended improvements to the tendering process for development, including not allowing areas to be put to tender without certified proof of its geological potential. The institution also suggests a tariff reform based on a continuous review process, so that present tariff can be readjusted to future rates.

With electricity demand growing at almost 4.8 percent annually and 35 percent of the country’s inhabitants living without electricity, according to the International Energy Agency, geothermal power could be the solution, especially as it is free from the price uncertainty associated with traditional fuels.

“Geothermal power represents an energy source that is not subject to volatility as the price remains flat. It will also free up other resources such as coal and oil for export,” says Rahul Shah, chief financial officer at Sorik Merapi Geothermal Power.

Geothermal energy is widely understood to be a proven technology that is more environmentally friendly, with fewer resultant greenhouse gas emissions. Development in the industry means generating power is becoming easier and more efficient.

“This energy is replenished through natural means and therefore does not lead to concerns of energy security for our future generations,” Shah said. He added that with new developments in technology, geothermal plants were now able to generate power at much lower temperatures than before.

Another development in the sector is a technology known as Enhanced Geothermal Systems (EGS), which artificially cracks hot rocks to release steam to power the turbines without the need for a nearby water source.

Geothermal plants are often located in forest areas and displace nearby inhabitants, raising concerns over the land space needed as well as the impact on biodiversity.

However, with research and new technology, pinpointing potential geothermal spots can be space-efficient, says Indra Sari Wardhani, climate and energy manager at WWF Indonesia. She cites the plant in Salak as an example, saying that the facility, which has a capacity of 330 MW, takes up around 175 hectares of land.

“When you have determined the amount of capacity and the potential points, the area that is used is not big,” she says.

The WWF developed guidelines last year for sustainable development of the geothermal sector in forest areas, highlighting environmental considerations such as maintaining biodiversity and mitigating deforestation and social disruption.

Indra Sari says geothermal energy is likely to be a huge part of Indonesia’s move toward renewable sources of energy.

GlobeAsia

Saturday, April 11, 2015

Sumba Renewable Energy: A Bright Future Where the Lights Don’t Go Out

Jakarta Globe, Basten Gokkon,  Apr 10, 2015

Photovoltaics on the eastern islands of Sumba are being used for electricity
generation. (Antara Photo/Hafidz Mubarak)

Waingapu, Sumba. Five years ago, Dorkas Manuhuluk, a Sumbanese headmistress, would ask her staff to ride a bike for 45 minutes to a neighboring village just to make copies of question sheets for her students.

“It’d be free if we used our own motorcycle, but we don’t own one. We’d call an ojek [motorcycle taxi] which costs Rp 50,000 ($3.80) for one trip,” said Dorkas, who currently heads Praimarada Elementary School in Umamanu village, one-and -a-half hours’ drive southwest of Waingapu — the biggest city in East Sumba district, East Nusa Tenggara.

Markus Karepi Muama, a teacher at Praimarada, said sixth graders would light kerosene lamps as they stayed overnight at the school, studying for an upcoming national examination.

“For a whole month ahead of national exam, we teach and repeat as much material as possible with the students every evening,” said Markus.

Meanwhile, farmers in East Sumba  district’s two neighboring villages — Rakawatu and Kondamara, located some 70 kilometers west of Waingapu — would often stop growing and harvesting paddies during an unusually long dry season on the island.

“During the dry season, we would pump the water from a nearby spring,” said Made Raspita, one of the farmers.

“For a long while, we would use diesel as fuel for the water pump generator, regardless its skyhigh price,” he added.

Affected by the hot, dry air from the deserts of Northern Australia, Sumba — one of the southernmost islands in the archipelago — does not receive nearly as much rainfall as the islands to the north.

November to March is the rainy season for Sumba, while the sun shines on the island during the rest of the year. This means farmers consume massive amount of diesel to run the water pump generator to help the irrigation system.

Electricity shortage

In 2010, researchers from two international nongovernmental organizations, Hivos and Winrock, released a study that found less than 25 percent of Sumba’s 686,000 residents have access to electricity at home.

Researchers also discovered the electricity used by the locals in Sumba was heavily sourced from non-renewable energy, such as diesel and kerosene, which is shipped in from outside the island, resulting in higher operational costs.

State electric utility PLN has cited Sumba’s relatively sparse population as the reason the firm remains reluctant to install a more robust electrical grid to electrify the island’s remote villages.

“It costs about Rp 300 million per kilometer of electrical extension grid.”

“It’s too costly for us considering the small amount of people that will use the electricity,” Khairullah, area manager of PLN in Sumba, told The Jakarta Globe on Tuesday.

When the Jakarta Globe visited Praimarada Elementary School on Monday, the nearest electricity pole to the school was some five kilometers away — one that also looked questionably functional.

Meanwhile, the last standing electricity pole on the road leading to Rakawatu and Kondamara was about 40 minutes away from the two villages.

Since March 2011, PLN has instead provided remote villages across the archipelago with energy-saving lamps, known locally as Sehen, which are sources of artificial light that reduce the amount of electricity drawn from the local grid, since they are connected to a solar panel.

These lamps can stay lit for about six hours.

The light at the end of the tunnel

Joint research from the two NGOs found that Sumba is rich in renewable energy sources, such as solar, wind, water and biomass.

Hivos and Winrock then chose Sumba as the island to launch it’s ambitious project — for the island’s entire population to gain access to electricity generated from renewable energy by 2025.

The project called “Sumba Iconic Island” was launched in 2010 with the full support of Indonesia’s Energy Ministry and the PLN in Sumba.

Drawing global attention. In May 2013, the Asian Development Bank (ADB) committed $1 million to support the technical side of the project.

The Norwegian Embassy in Indonesia then joined in October 2013, funding 600,000 euros ($644,000) for the program.

“This program strives for humanity sovereignty. And energy is important for people,” Stig Traavik, Norway’s ambassador to Indonesia, told the Jakarta Globe when asked why the embassy decided to partake in the project.

“Norway as a nation that cares about the environment, clean energy and resources of the future, this is a program where it all comes together — including poverty reduction. This is an illustration of what we would like to continue doing,” he added.

Fruitful and promising result

Four years after the program was launched, some areas of Sumba have experienced the same, abundant benefits from power plants that operate on renewable energy.

In April last year, a 1.5 kilowatt-hour (kWh)  solar panel was installed at Praimarada Elementary School, providing full electricity for the school’s administrative and teaching activities.

“If we want to make copies of something, we can just print it out now with our own printer. We’re spending much less money this way,” said Dorkas.

“If we receive study books late from the distributor, we can ask for the softcopy and print them out.”

“When we’re doing the preparation activity ahead of the national exam, students can now learn under sufficient lighting and we’ve stopped using kerosene lamps,” Markus added.

Across the island

Residents at other villages also said they have had a great results since power plants run with renewable energy sources were built and began operating at their villages a couple of years ago.

“The power generator can provide electricity for the whole village,” said Umbu Tamu, leader of a small management team for a biomass power plant at Rakawatu, which has capacity of 50 kilovolt-amperes.

“We’ve stopped using diesel since the water pump generator is now running on solar energy.”

“The generator can water our paddy and vegetable field,” Made said, referring to a solar panel installation set up two years ago for supplement the village’s water pump generator. It can supply up to 80,000 liters of water.

During a visit to several project sites in East Sumba district earlier this week, Energy Minister Sudirman Said and Norwegian Ambassador Stig praised the successes of the villages.

“One of Jokowi’s management programs is how to reach energy sovereignty. I think this is one of the ways that can and will expedite energy sovereignty in the country,” Sudirman told the Jakarta Globe.

“I see a great potential in Sumba. I think it would be inspiring, not only for the population here but also for Indonesia if Sumba is able to reach this goal of becoming 100 percent on renewable energy,” said Stig.

Whose responsibility?

Modern technology needs proper and periodical maintenance, which can require a massive amount of budget.

These power plants, however, are considered an off-grid electricity system, meaning it is not part of any electrical grids that are operated and monitored by the PLN.

“The PLN can only do maintenance for the on-grid system. But, we would be more than happy if there’s a regulation that lets us do maintenance for the off-grid as well,” said Khairullah.

As of now, the villages and school appoint one person from a small committee to do regular monitoring of the power plants.

The electricity has become a source of income for the villages as it is sold off to the public.

For instance, Praimarada Elementary School charges anyone from neighboring villages who wishes to use electricity for personal purposes, Rp 1,000 per use.

“People mostly come to charge their mobile phone,” Markus said.

“The money that we collect is entered into a book, and when the equipment needs service, we can use the bulk that we have.”

Praimarada’s solar panel operates on six batteries that can last for up to five years at a cost of Rp 2 million each, according to Sandra

Winarsa, program officer for sustainable energy at Hivos Regional Office Southeast Asia.

A similar fee-collecting system has also been adopted in the village of Rakawatu, where households that own television sets are charged Rp 50,000 per month and those who only use the electricity for lighting pay Rp 35,000 monthly, Tamu said.

“The monthly fee is not that much. But, that’s how much we can contribute from our income,” Tamu added.

“We don’t receive any funding from outside to help operational expenses. If the government could help us with the maintenance cost, then that would be great.”

Sudirman said the people could request funds from the regional government should they need to fix or replace parts of the power plants.

“If the residents need a huge amount of funds for maintenance, they can ask the regional government through the DAK [specific allocation fund] program.”

“It is permitted by the ministry to use the funds to substitute old units,” the energy minister told the Jakarta Globe.

Sudirman added that he would evaluate the energy subsidy in the state budget to also help people who generate electricity from renewable-energy based power plants.

“It is our homework and this is something that needs to be reviewed so that energy subsidy can be fair and even for everyone,” he said.

“The subsidy could be also by providing seed funds to help set up the power plants.”

Where’s next after Sumba?

Sudirman said he would form a special committee to help the ministry frame a nationwide blueprint for power plants that operate on renewable energy.

“The committee will also help push [Sumba] to expedite its target — if possible by 2020 — in becoming an example of an island in Indonesia that completely uses renewable energy,” Sudirman said.

“There is not yet a developed industry [in Indonesia] for renewable energy.”

“It will be soon enough we require more equipment [to support renewable energy].”

“It is then important to educate the people that renewable energy is our future,” he added.

Sudirman also believed Sumba could be a living example for other areas across the country, saying that the next government must put forward the interest of renewable energy in the country above all else.

“Do not mix politics with energy development. Political interests do not last forever, but energy development does and it takes a long time. It also requires a technical approach,” he said.

“There are many other areas in the country similar to Sumba. Should the renewable energy goal be achieved, it will be an easy example to duplicate in other areas.”

Related Article:



Thursday, April 2, 2015

Billionaire Sy to Build Micro Cities Around His Philippine Malls

Jakarta Globe, Ian Sayson, Apr 01, 2015

Filipino residents paint homes as an AirAsia plane flies over at a housing project
in Paranaque city, south of Manila, Philippines, on March 25, 2015. Growth in the
 Philippine economy is set to pick up in 2015 as government expenditure
expands and both private consumption and investment remain strong, says a
new Asian Development Bank report. (EPA Photo/Francis R. Malasig)

Billionaire Henry Sy, the richest person in the Philippines, will start to develop apartments, offices and hotels around his shopping malls to maximize the value of property holdings in the face of similar moves by competitors.

Fifteen of 50 shopping malls now owned by Sy’s SM Prime Holdings are on land large enough for high-density, mixed-used development, executive vice president Jeffrey Lim, 53, said in an interview in Manila on Monday. Depending on demand, five so-called townships will be built in two years and about 10 more over five years, he said.

The townships will be part SM Prime’s 500-billion-peso ($11 billion) expansion from now through 2019, Lim said. They will pit the largest Philippine mall developer against Ayala Land and Megaworld, the biggest builders of mixed-used projects. Ayala and Megaworld have been building townships for several years, capitalizing on the rising office-space needs of outsourcing companies, while higher remittances from Filipinos abroad have fueled home purchases.

“SM Prime has plenty of resources around its malls, and these will become expensive parking lots if they don’t do this,” said Richard Laneda, an analyst at COL Financial Group, who has a buy rating on the company’s stock. “If they don’t do this, the market will go to the other developers.”

Publicly-held Philippine builders’ push for townships in and out of Manila boosted their capital spending to a record 331 billion pesos, according to broker Savills. Congestion in Metro Manila is driving demand in these micro-districts, it said.

‘On their toes’

Remittances climbed 5.8 percent to a record $24.3 billion last year. Money transfers from Filipinos living and working overseas account for about 10 percent of the nation’s economy, the World Bank estimates.

“The live-work-play lifestyle in these townships have resulted into a lot of success for some major developers,” Michael McCullough, Manila-based managing director at KMC MAG Group, the local associate of Savills, said in mid-March.

SM Prime “has to be on their toes to continue to have the upper hand,” said Allan Yu, first vice president at Manila- based Metropolitan Bank & Trust. He helps manage  about $7.5 billion, including SM Prime shares. “They have to upgrade their existing assets, not just expand their portfolio.”

Growing landbank

SM Prime has gained 37 percent over the last year, exceeding the 30 percent gain in Megaworld and the 29 percent advance in Ayala Land. The Philippine Stock Exchange Index has added 24 percent in that period and the Bloomberg Asia Pacific Real Estate Index 24 percent.

Net income will climb 19 percent this year to 21.87 billion pesos, according to median of 13 analyst estimates compiled by Bloomberg.

The company’s landbank stands at 900 hectares, Lim said. Before Sy pooled his property assets into SM Prime in 2013, the mall builder’s landbank was about 120 hectares, Lim said.

Sy, who is 90, has an estimated net worth of $13.4 billion, according to the Bloomberg Billionaires Index. He migrated to the Philippines from China in 1936 and started selling rice, sardines and soap in his father’s Manila store. He opened a shoe store in 1948 and eventually built his business empire in the 1980s by opening malls.

Manila reclamation

SM Prime plans to spend 70 billion pesos this year to build malls and homes. After constructing three to four malls a year, SM Prime has said it plans to open as many as five in 2015. It plans to start five new residential projects this year and expand existing developments if there is demand.

As part of its strategy for 2015, SM Prime aims to sell as many as 14,000 homes valued at about about 3 million pesos each, Lim said. There is not a supply glut in that portion of the market, he said. The company gets about a third of revenue from home sales.

For the longer term, the company has applied to reclaim 600 hectares of land along Manila Bay and spend about 100 billion pesos to turn the property into a master planned integrated and mixed-use community. The development is adjacent to the group’s Mall of Asia complex and the strip of four integrated casino resorts that will make up Pagcor Entertainment City.

That plan, which has won permission from the city governments of Pasay and Paranaque, will be among the single biggest contiguous developments in Manila if approved by the nation’s economic planning agency.

“A number of our malls have excess land, and these are just there untouched,” Lim said. “Our thrust is to maximize the synergies of integrated development. Building lifestyle cities will maximize the potential of our properties.”

Bloomberg

Thursday, May 29, 2014

Indonesia to Start Work on World’s Biggest Geothermal Plant in June

Jakarta Globe, Fathiyah Dahrul and Fergus Jensen, May 29, 2014

Indonesia has only exploited around five
 percent of its world-leading geothermal
potential. (JG Photo/Rezza Estily)
Jakarta. Indonesia will begin construction next month of its long-delayed $1.6-billion Sarulla project, the world’s biggest geothermal power plant, the country’s chief economic minister said on Wednesday.

Southeast Asia’s largest economy, home to the world’s largest geothermal resources, is racing to meet power demand growth of more than 7 percent a year, with plans to add 60 gigawatts of capacity to its existing grid by 2022.

But the sector has struggled to attract investment because of complex regulations and difficulties securing project finance. A government plan to derive 12 percent of the country’s energy mix from geothermal power by 2025 seems unrealistic.

“The Sarulla groundbreaking will be very soon,” Coordinating Economic Minister Chairul Tanjung told reporters, adding that the project had reached financial closing and the government expected construction to begin next month.

He declined to give further details.

The project was originally initiated in 1990 but ground to a halt during the Asian financial crisis in 1997. Its first phase is expected to begin operation in 2016, with the next two phases to follow within 18 months of the first phase.

The 330-MW Sarulla project is envisioned to provide clean power to an Indonesian grid dominated by fossil-fuel energy. Sarulla is expected to reduce 1.3 million tonnes of carbon dioxide emissions a year when completed in 2018.

The financing of the project has been heralded as a breakthrough for Indonesia’s largely undeveloped 29 gigawatts of geothermal potential.

The banks involved in the financing are the Japan Bank for International Cooperation (JBIC) and the Asian Development Bank (ADB) along with Bank of Tokyo-Mitsubishi UFJ Ltd, ING Bank NV (a unit of ING Groep NV ), Societe Generale, Sumitomo Mitsui Banking Corportation, Mizuho Bank Ltd and National Australia Bank.

The project is sponsored by Itochu Corporation (25 percent), Kyushu Electric Power Company (25 percent), Medco Power Indonesia (37.5 percent), a unit of Medco Energi Internasional and Ormat International, a unit of Ormat Technologies (12.5 percent).

The Sarulla plant’s recent financial close makes it Indonesia’s first geothermal project to gain financing since Star Energy’s 227-MW Wayang Windu plant commenced in 1997.

Related Articles:

ADB Supports Renewable Energy by Investing in Indonesian Geothermal Plant


"A Summary" – Apr 2, 2011 (Kryon channeled by Lee Carroll) (Subjects: Religion, Shift of Human Consciousness, 2012, Intelligent/Benevolent Design, EU, South America, 5 Currencies, Water Cycle (Heat up, Mini Ice Ace, Oceans, Fish, Earthquakes ..), Middle East, Internet, Israel, Dictators, Palestine, US, Japan (Quake/Tsunami Disasters , People, Society ...), Nuclear Power Revealed, Hydro Power, Geothermal Power, Moon, Financial Institutes (Recession, Realign integrity values ..) , China, North Korea, Global Unity,..... etc.) - (Text version)

“... Japan

Let us talk for a moment about Japan, and then I'll close the day of messages. There are thousands of souls on my side of the veil and they're just fine, more than fine. We have spoken so often of what happens at the Wind of Birth. I told you, before they even came in, they saw the potential. I looked in their eyes. "You may not last long. You know that, don't you? You're coming into this planet and you may not be here very long. And the passing that you will have with your family will not be pleasant, if any ever are. Why would you come in anyway?" I want to tell you what they said. When a soul has the mind of God, it understands fully what generates peace and what generates energy shift. You can clearly see what generates what the planet needs the most when you are about to arrive. So they said, "We're going to be part of one of the biggest compassion events the planet has ever seen." One earthquake, one tsunami. All of those who left that day will change the earth forever. And it already has. It was the same for the last tsunami as well.

Every single one of them on my side of the veil is getting ready to come back. Many old souls were involved, and just for a moment, if they could give you any information, if they could talk to you right now, if they could speak your language and look into your eyes, they would thank you for your compassion for them and those who are left. And they would say, "Be with those family members who are still alive. Enter their hearts every day and give them peace and keep them from crying, because we're OK."

Nuclear Power Revealed

So let me tell you what else they did. They just showed you what's wrong with nuclear power. "Safe to the maximum," they said. "Our devices are strong and cannot fail." But they did. They are no match for Gaia.

It seems that for more than 20 years, every single time we sit in the chair and speak of electric power, we tell you that hundreds of thousands of tons of push/pull energy on a regular schedule is available to you. It is moon-driven, forever. It can make all of the electricity for all of the cities on your planet, no matter how much you use. There's no environmental impact at all. Use the power of the tides, the oceans, the waves in clever ways. Use them in a bigger way than any designer has ever put together yet, to power your cities. The largest cities on your planet are on the coasts, and that's where the power source is. Hydro is the answer. It's not dangerous. You've ignored it because it seems harder to engineer and it's not in a controlled environment. Yet, you've chosen to build one of the most complex and dangerous steam engines on Earth - nuclear power.

We also have indicated that all you have to do is dig down deep enough and the planet will give you heat. It's right below the surface, not too far away all the time. You'll have a Gaia steam engine that way, too. There's no danger at all and you don't have to dig that far. All you have to do is heat fluid, and there are some fluids that boil far faster than water. So we say it again and again. Maybe this will show you what's wrong with what you've been doing, and this will turn the attitudes of your science to create something so beautiful and so powerful for your grandchildren. Why do you think you were given the moon? Now you know.

This benevolent Universe gave you an astral body that allows the waters in your ocean to push and pull and push on the most regular schedule of anything you know of. Yet there you sit enjoying just looking at it instead of using it. It could be enormous, free energy forever, ready to be converted when you design the methods of capturing it. It's time.

So in closing, do you understand what you're seeing? You're seeing intelligent design, quantum energy and high consciousness. You are seeing changes in Human nature. You're seeing countries putting things together instead of separating. You are seeing those who don't want war and instead want peace, good schools for their children, safety in their streets and a say in their government. We told you it was going to happen this way. I want my partner to teach these things that I have said in his 3D lectures for awhile. Many won't be able to know these things otherwise.  …”

Monday, March 31, 2014

ADB Supports Renewable Energy by Investing in Indonesian Geothermal Plant

ADB, 31 March 2014

MANILA, PHILIPPINES – The Asian Development Bank (ADB) has signed a $350 million financing package supporting the construction of the 320 megawatt Sarulla Geothermal Power Development Project in North Sumatra, Indonesia, an investment expected to unlock clean energy investments across the country, which holds 40% of the world’s geothermal resources.

The renewable energy project will provide clean, baseload power to an Indonesian grid currently dominated by aging coal and oil-fired power plants. It is expected to reduce 1.3 million tons of carbon dioxide emissions per year upon completion, which is estimated to be in 2018.

“Geothermal power taps into an abundant indigenous resource in Indonesia that can provide a more sustainable and secure form of clean energy while significantly lowering carbon emissions,” said Jackie B. Surtani, Senior Investment Specialist in ADB’s Private Sector Operations Department.

Indonesia currently uses coal and oil to produce 65% of its electricity and fuel its economic growth. The country has vowed to increase the share of renewable energy in its primary energy supply from 5% in 2010 to 25% by 2025, and reduce greenhouse gas emissions by 26% by 2020. Geothermal plants typically produce less than 10% of the greenhouse gas emitted by fossil-fuelled thermal plants.

Under the loan package, ADB will provide $250 million from its ordinary capital resources, $80 million from the ADB Clean Technology Fund (CTF), and $20 million from the Canadian Climate Fund for Private Sector in Asia (funded by the Government of Canada) under the Clean Energy Financing Partnership Facility. The project represents the first deployment by ADB of the Canadian Climate Fund and the first disbursal of CTF funds by ADB in Indonesia.

ADB’s climate finance capabilities were instrumental in establishing the first commercially financed, utility-scale geothermal independent power plant project in Indonesia in more than a decade. The climate funds were structured as an innovative loan tranche that bridged the financing gap between banks and investors to maintain financial viability of the project.

The project sponsors are Itochu Corporation, Kyushu Electric Power Company, Ormat International, and Medco Power Indonesia.

Six commercial banks – Bank of  Tokyo-Mitsubishi UFJ, ING Bank, Mizuho Bank, National Australia Bank, Société Générale, and Sumitomo Mitsui Banking Corporation – will also co-finance the total $1.17 billion loan package, which ADB and Japan Bank for International Cooperation (JBIC) acted as Lead Structuring Banks.

The project will be developed and implemented under a 30-year energy sales contract with Perusahaan Listrik Negara, the national electricity utility company, a 30-year joint operating contract with Pertamina Geothermal Energy, and a 20-year guarantee from the Ministry of Finance.